Metal Finishing Guide Book

2012-2013

Issue link: https://metalfinishing.epubxp.com/i/98750

Contents of this Issue

Navigation

Page 700 of 903

When starting up a new filter system, or after servicing an existing system, it is advisable to completely close the valve on the downstream side of the filter; in this way, the pump will develop its maximum pressure, and one can immediately determine whether the system is secure. Sometimes filtration systems are tested on a cold solution and, in turn, will leak on a hot solution and vice versa. Therefore, a further tightening of cover bolts, flange bolts, and so on may be necessary after the filter has been operating at production temperature and pressure. If pump curves are not available, one may wish to check the flow at different pressure readings to determine a reasonable time for servicing the equipment before the flow rate has dropped too low to accomplish good dirt removal. 689

Articles in this issue

view archives of Metal Finishing Guide Book - 2012-2013